top of page
COMPLETED PROJECTS 2008
CHEVRON GEOTHERMAL POWER PLANT
Sto. Tomas, Batangas
Supply, Installation, Testing and Commissioning of Fire Alarm and Detection System
Supply, Installation, Testing and Commissioning of Fire Alarm and Detection System
GRACE CHRISTIAN CHURCH INC.
Cavite
Supply, Installation, Testing and Commissioning of Manual Transfer Sw. and Main Distribution Panel
Supply, Installation, Testing and Commissioning of Manual Transfer Sw. and Main Distribution Panel
SASON FURNITURE SHOP
Greenbelt 5, Makati, Metro Manila
Supply, Installation, Testing and Commissioning
Supply, Installation, Testing and Commissioning
SAN MIGUEL PACKAGING SPECIALIST
Supply, Installation, Testing and Commissioning of Electrical Works for Ventilating System
FITNESS FIRST
Eastwood, Quezon City
Installation, Testing and Commissioning Temperature and Humidity Controller
Installation, Testing and Commissioning Temperature and Humidity Controller
GRACE CHRISTIAN SANCTUARY
Quezon City
Installation, Testing and Commissioning of Electrical Works
Installation, Testing and Commissioning of Electrical Works
SACRED HEART MEDICAL CENTER
Angeles City, Pampanga
Installation of 360TR AC System consisting
Installation of Air Cooled Chillers, Chilled Water Pumps, AHUs, FCUs and Chilled Water Piping including Fabrication/Installation of AC
Installation of 360TR AC System consisting
Installation of Air Cooled Chillers, Chilled Water Pumps, AHUs, FCUs and Chilled Water Piping including Fabrication/Installation of AC
MANILA OCEAN PARK
Ermita, Manila
Project Management/Installation of A/C & Ventilation Ductworks
Project Management/Installation of A/C & Ventilation Ductworks
bottom of page