top of page
COMPLETED PROJECTS 2010
M/T SHOGUN TANKER VESSEL
Supply, Installation, Testing and Commissioning of Fire Detection and Alarm System
Supply, Installation, Testing and Commissioning of Public Address System
Supply, Installation, Testing and Commissioning of Public Address System
168 MALL
Binondo, Manila
Supply of Motor Control Panel For Air Handling Units
Supply of w/ Temperature Controller for Electrical Vault
Supply of Motor Control Panel For Air Handling Units
Supply of w/ Temperature Controller for Electrical Vault
DRUG MAKER LABORATORIES
San Pedro, Laguna
Supply of Automatic Voltage Regulator, 30KVA, 230V, 3PH
Supply of Automatic Voltage Regulator, 30KVA, 230V, 3PH
CROCK WAREHOUSE
212 Barangay Ugong
Supply, Installation, Testing and Commissioning of Lighting & Power for Electrical System
Supply, Installation, Testing and Commissioning of Lighting & Power for Electrical System
M/T STA. MONICA TUGBOAT
Re-wiring of all wires
UNISPHERE WAREHOUSE
Barangay Ugong
Installation, Testing and Commissioning of Electrical Downgrading
Installation, Testing and Commissioning of Electrical Downgrading
GINEBRA SAN MIGUEL
Canlubang, Laguna
Installation of 10 units Split Type Air-conditioning Units and Supply and Installation of ACU Piping System
Supply, Installation, Testing and Commissioning of Electrical System and 9 units of Split Type Air-Conditioning for GSMI Concentrate Plant
Installation of 10 units Split Type Air-conditioning Units and Supply and Installation of ACU Piping System
Supply, Installation, Testing and Commissioning of Electrical System and 9 units of Split Type Air-Conditioning for GSMI Concentrate Plant
bottom of page